25 Woodridge (The Orion)
Alliance helped Ferguslea achieve environmental sustainability for this building built in the 1960s.
- Client: Ferguslea Properties Ltd.
- Project Type: Design-Build and Sustainability Planning
About This Project
Alliance provided Ferguslea with its Guaranteed Maximum Pricing which eliminated unnecessary project delays and budget overruns. With Guaranteed Maximum Pricing, Alliance was able to specify the cost for configuration, features, and materials. Alliance also took on responsibility for all trades required for the project. Alliance worked closely with our team from pre-construction to completion in order to achieve the client’s objectives for The Orion building.
To reduce the negative impact on the tenants, Alliance put in a significant amount of time and effort scheduling and coordinating the removal and replacement of infrastructure components and completing the interior finishes. Once all the new piping was installed throughout the floors, Alliance then sectioned off each floor into three sections for work to be completed in the tenants’ suites. Alliance found this process to be highly successful because it limited the number of trades at any given time, and allowed the tenants to plan for the required activities.